NT boat ramps

Post by Matt Flynn »

Territorians were chuffed to hear Dundee and Shady Camp boat ramps were to be upgraded ...

I wonder what other states have been up to? Maybe

Queensland ...

Far North District
1 Mulgrave Redbank Road/Packers Camp, Cairns Upgrade existing boat ramp to 4 lanes plus floating walkway 2016/17 MIF
2 Mulgrave Bellenden Ker, Cairns Upgrade existing boat ramp to current standards 2016/17 MIF
3 Mulgrave Edmonton boat ramp Installation of new pontoon 2017/18 MIF
MICMP
4 Cook Rosehill Dinghy Harbour Maintenance dredging 2016/17 MICMP
5 Cook Port Douglas Dredging to deepen and widen entrance channel 2017/18 MIF
MICMP
6 Barron River Northern Cairns Boating Facility New four lane boat ramp plus floating walkway (location to be determined) 2017/18 MIF
7 Barron River Bluewater Marina Installation of new floating walkway 2017/18 MIF
8 Cairns Fearnley Street, Cairns Rebuild existing boat ramp plus new floating walkway 2017/18 MIF
9 Dalrymple Church Street, Tinaroo Boat ramp maintenance 2016/17 MICMP
10 Hinchinbrook Clump Point, Mission Beach Contribution to upgrade boat ramp facility as part of the Mission Beach Safe Boating Infrastructure project 2016/17 MIF
MICMP
11 Hinchinbrook Hull Heads, Tully Hull Road Upgrade ramp and overlay shoulder repairs 2016/17 MICMP
12 Hinchinbrook Mourilyan Boat Harbour Feasibility study for possible breakwater extension 2016/17 MICMP
13 Hinchinbrook Mourilyan Harbour Extension of breakwater if deemed feasible 2017/18 MIF
14 Hinchinbrook Mourilyan Harbour Replacement of fendering on floating walkway 2016/17 MICMP
15 Hinchinbrook Maria Creek Feasibility study to upgrade existing boat ramp 2017/18 MICMP
16 Hinchinbrook Kurrimine Beach Feasibility study to upgrade existing boat ramp 2017/18 MICMP
North Queensland District
17 Townsville Townsville Recreational Boating Park Boat ramp mud removal 2016/17 MICMP
18 Burdekin Ocean Creek Upgrade of existing boat ramp 2016/17 MIF
19 Burdekin Barramundi Creek Upgrade boat ramp plus new floating walkway 2016/17 MIF
20 Burdekin Plantation Creek Boat ramp maintenance 2016/17 MICMP
21 Burdekin Hell Hole Landing Resurface existing boat ramp 2017/18 MICMP
22 Hinchinbrook Dungeness, Lucinda Grant funding for new gangway access pontoon 2017/18 MICMP
North West District
23 Mt Isa Burketown Rebuild and widen existing boat ramp to three lanes 2016/17 MIF
Mackay/Whitsunday District
24 Burdekin Starboard Road, Bowen Boat Harbour Widen existing boat ramp plus floating walkway 2016/17 MIF
25 Burdekin Horseshoe Bay Road, Greys Bay, Bowen Rebuild and widen existing boat ramp plus floating walkway 2016/17 MIF
26 Burdekin Bowen Boat Harbour New entrance beacons for the widened channel 2016/17 MIF
27 Burdekin Molongle Creek Feasibility study for new access options 2016/17 MICMP
28 Whitsunday Airlie Beach Feasibility study for new pontoon 2016/17 MIF
29 Whitsunday St Helens Beach, Carpet Snake Point Upgrade existing boat ramp and causeway 2016/17 MIF
30 Whitsunday Cape Gloucester area Feasibility study for new boat ramp 2016/17 MICMP
31 Whitsunday Proserpine River Duplication of boat ramp from two to four lanes 2017/18 MIF
32 Mackay Port Binnli, Mackay Installation of an additional floating walkway 2016/17 MIF
33 Mackay River Street, Mackay Upgrade existing boat ramp plus installation of floating walkway 2017/18 MIF
34 Mirani Sarina Beach Feasibility study for new floating walkway 2017/18 MICMP
Central Queensland District
35 Rockhampton Ski Gardens, Fitzroy River, Rockhampton Rebuild existing boat ramp 2016/17 MIF
36 Rockhampton Callaghan Park, Fitzroy River Rockhampton New 4 lane boat ramp plus floating walkway 2017/18 MIF
MICMP
37 Mirani Banksia Road, Stanage Bay Upgrade existing boat ramp, replace piles and investigate new pontoon 2016/17 MIF
38 Mirani Port Alma Feasibility study for an additional boating facility 2017/18 MICMP
39 Keppel Rosslyn Bay Boat Harbour Dredging works 2016/17 MICMP
40 Keppel Causeway Lake, Mulambin Rebuild existing boat ramp to current standards 2016/17 MIF
41 Keppel Coorooman Creek Entrance channel monitoring 2016/17 MICMP
42 Keppel Thompson Point Feasibility study for new two lane boat ramp plus floating walkway 2017/18 MICMP
43 Callide Glebe Weir Upgrade existing facility 2017/18 MIF
Wide Bay/Burnett District
44 Burnett Burnett Heads Boat Harbour Rebuild existing boat ramp 2016/17 MIF
45 Burnett Four Knots Point, Burnett River Feasibility study to expand existing boat ramp plus floating walkway 2016/17 MICMP
46 Burnett Winfield Road, Winfield Feasibility study for a new floating walkway 2016/17 MICMP
47 Maryborough Burrum Heads, Lions Park Completion of new boating facility 2016/17 MIF
48 Maryborough March Street, Maryborough Demolition of old jetty 2016/17 MICMP
49 Gympie Bullock Point Road New 2 lane boat ramp plus floating walkway 2016/17 MIF
50 Hervey Bay River Heads Rebuild existing boat ramp plus floating walkway 2017/18 MIF
51 Hervey Bay Urangan Boat Harbour Installation of 2 new floating walkways 2017/18 MIF
North Coast District
52 Pumicestone Bellara, Bribie Island Widen existing boat ramp by 1 lane 2016/17 MIF
53 Pumicestone Bellara, Bribie Island Maintenance dredging 2016/17 MICMP
54 Redcliffe Pelican Park, Clontarf Installation of new floating walkway and removal of old pontoon 2016/17 MIF
55 Murrumba Dohles Rocks Road, Griffin Installation of floating walkway or rock groyne 2017/18 MIF
MICMP
56 Murrumba Uhlmann Road, Burpengary Installation of new floating walkway 2017/18 MIF
57 Buderim Fishermans Road, Maroochydore Rebuild existing boat ramp to current standard plus floating walkway 2017/18 MIF
58 Maroochydore Mooloolaba Entrance channel dredging 2016/17 MICMP
59 Maroochydore Penny Lane, Mooloolaba Installation of new pontoon 2017/18 MIF
60 Caloundra Lara Street, Currimundi Rebuild existing boat ramp 2017/18 MIF
Metro District
61 Sandgate Deep Water Bend Repair pontoon 2016/17 MICMP
62 Lytton Manly Boat Harbour Public channel deepening and maintenance dredging 2016/17 MIF
MICMP
63 Lytton Manly Boat Harbour Replace southern pontoon 2017/18 MIF
64 Bulimba Colmslie boat ramp Completion of upgrading works and new pontoon 2016/17 MIF
65 Clayfield Brisbane River, Hamilton Installation of new pontoon 2017/18 MIF
66 Redlands Macleay Island Construction of new boat ramp 2016/17 MIF
67 Redlands Lamb Island Feasibility study for new boat ramp 2017/18 MICMP
68 Cleveland Raby Bay (east) Maintenance dredging 2016/17 MICMP
69 Cleveland One Mile channel Bed levelling to entrance channel 2016/17 MICMP
70 Bundamba Goodna boat ramp Feasibility study to upgrade existing facility 2017/18 MICMP
Darling Downs District
71 Warrego Chinchilla Weir Installation of new pontoon 2016/17 MIF
72 Warrego Caliguel Lagoons, Condamine Installation of new pontoon 2016/17 MIF
South West District
73 Warrego Dirranbandi Construction of a new single lane boat ramp 2016/17 MIF
74 Warrego Dirranbandi Installation of new pontoon 2016/17 MIF
Marine Infrastructure Fund (MIF) capital works projects delivered through the Marine Infrastructure Capital and Maintenance Program (MICMP) from 1 July 2015 – listing current at 18 August 2016

Project Announced Planned completion Status
Far North
Rocky Point (Dayman Point - Daintree area), boat ramp upgrade Jul 2014 Completed Project completed. Opened to the public December 2015.
View a photo of the upgraded boat ramp (JPG, 627 KB).
Weipa, Evans Landing, relocate boat launching facility Jul 2014 Completed Project completed. Opened to the public December 2015.
View a photo of the new facility (JPG, 403 KB).
Cairns, Tingira Street, new floating walkway Jul 2014 Mid 2016 Project completed. Opened to the public on 6 June 2016.
View a photo of the new floating walkway (JPG, 270 KB).
Clump Point, Mission Beach, boat ramp widening from 2 to 3 lanes and install floating walkway Dec 2013 Late 2016 Preparation of a development plan for Clump Point – joint project with TMR and the Department of State Development (DSD). TMR staff have attended five community reference group meetings at Mission Beach through to 18 August 2016. The study will take planning to date and feedback from the community and develop both commercial and recreational user options for the Clump Point Development Plan.
Bellenden Ker, Russell River (south of Cairns) upgrade boat ramp and add lane Mar 2016 Early 2017 Design continuing.
Packers Camp, Mackey's Creek, Redbank Rd (south of Cairns) rebuild existing boat ramp to four-lanes plus install a floating walkway Mar 2016 Early 2017 Detailed design completed July 2016. Car-trailer parking area concept finalisation and consultation with Cairns Regional Council scheduled for August 2016.
Northern
Townsville Recreational Boating Park (TRBP), Ross River, Stage 1, two new 4-lane boat ramps each with a floating walkway, plus a single pontoon. Stage 2 - two new 4-lane boat ramps each with a floating walkway plus a single Disability Discrimination Act 1992 compliant pontoon Dec 2012 Completed for Transport and Main Roads component August 2015 Joint project between Townsville City Council (TCC) and Transport and Main Roads.
Stage 1: works completed in March 2015. Facility officially opened on 17 April 2015.
Stage 2: in-water works completed in August 2015. Associated car parking by TCC will occur in 2016-17.
View a photo of the Townsville Recreational Boating Park (JPG, 221 KB).
Burdekin, Ocean Creek, boat ramp upgrade Jan 2015 Late 2016 Construction commenced July 2016 with the boat ramp expected to be closed for 3 months.
Bushland Beach, Marina Drive, Stony Creek (north of Townsville), new floating walkway Dec 2013 Completed Project completed March 2016.
View a photo of the new floating walkway (JPG, 409 KB).
Saunders Beach (north of Townsville), new floating walkway Dec 2013 Completed Project completed March 2016.
View a photo of the new floating walkway (JPG, 1.32 MB).
Mackay/Whitsunday
Abel Point Marina (Whitsunday Coast), pontoon upgrade Dec 2013 Completed Project completed April 2016.
View a photo of the new pontoon (JPG, 2.11 MB).
Bowen Boat Harbour, entrance widening, beacon installation and internal channel dredging Jan 2016 Mid-2016 Entrance widening and internal channel dredging completed June 2016. Beacon re-installation expected to be completed November 2016.
View a photo of the dredging (JPG, 2.99 MB).
Bowen, Horseshoe Bay Road rebuild boat ramp plus new floating walkway Jun 2016 Mid-2017 Rebuild the boat ramp to current standard with an additional lane to install a new floating walkway. Detailed design continuing.
Mackay, Port Binnli, new floating walkway Mar 2016 2016-17 Concept design completed July 2016. Owners’ consent approvals process commenced July 2016. Comments and consultation with port stakeholders scheduled for August 2016 to finalise the project development plan.
St Helens Beach, Carpet Snake Point (north of Mackay) upgrade boat ramp
Jun 2016 Mid-2017
Detailed design continued through July 2016. Mackay Regional Council submitted development approval application in July 2016.
Fitzroy
Gladstone, Hanson Rd, widen boat ramp for the provision of a new floating walkway Dec 2013 Completed Project completed December 2015.
View a photo of the new floating walkway (JPG, 2.27 MB).
Nerimbera, Fitzroy River, boat ramp widening from 2 to 4 lanes Jan 2015 Completed Project completed October 2015.
View a photo of the Nerimbera boat ramp upgrade (JPG, 1.99 MB).
Coorooman Creek (south Capricorn Coast), widen existing boat ramp from two to four lanes Jan 2015 Completed Project completed February 2016.
View a photo of the opening of the new boat ramp (JPG, 39 KB).
Rockhampton, Ski Gardens (Huet St, Wandal) rebuild boat ramp Mar 2016 Early 2017 Final concept plan forwarded to Rockhampton Regional Council for comments in July 2016.
Wide Bay/Burnett
Burrum Heads, new two-lane boat ramp plus new floating walkway Dec 2012 Late 2016 Construction continuing.
Burnett Heads, partial re-build of boat ramp Oct 2015 Late 2016 Contract awarded July 2016 with construction scheduled to commence August 2016 to take 14 weeks to complete. The 4-lane ramp will be closed 2-lanes at a time to allow use throughout the re-build.
North Coast
Toorbul, Freeman Rd, new floating walkway Dec 2013 Completed Project completed September 2015.
View a photo of the new floating walkway (JPG, 53 KB).
Twin Waters, Nojoor Rd (Maroochy River), new 2-lane boat ramp plus floating walkway Jan 2015 Completed Project completed July 2016. Sunshine Coast Regional Council (SCRC) managed this project through a deed of agreement arrangement with Transport and Main Roads.
View a photo of the new boat ramp and floating walkway (JPG, 510 KB).
Bellara, Bribie Island add additional lane to existing boat ramp Mar 2016 Mid 2017 Addition of a new lane to the south side of the boat ramp to compensate the lane lost for the floating walkway. Detailed design commenced August 2016.
Metro
Manly Boat Harbour northern breakwater raising and extension plus raising of the southern breakwater. Jul 2014 Completed Project completed. Northern breakwater raising and extension completed December 2014. Southern breakwater works completed July 2015.
View a photo of the new Manly northern breakwater (JPG, 1.59 MB).
View a photo of the new Manly southern breakwater (JPG, 507 KB).
Relocation of Manly Boat Harbour navigation leads Jul 2014 Completed Project completed July 2015.
View a photo of the new Manly front lead (JPG, 434 KB).
View a photo of the new Manly rear lead (JPG, 725 KB).
Manly Boat Harbour northern breakwater lighting Jul 2014 Completed Project completed March 2016.
View a photo of the new Manly northern breakwall flood lighting (JPG, 766 KB).
Bald Hills, Barungwarra Reserve, new single lane boat ramp Dec 2015 Mid 2016 Project completed June 2016.
View a photo of the upgraded boat ramp (JPG, 687 KB).
Colmslie (Brisbane), upgrade facility Jul 2014 Late 2016 Construction commenced July 2016 with the boat ramp expected to be closed until mid-September 2016.
Kedron Brook floodway (Nudgee), add additional lane to existing boat ramp plus new floating walkway Jul 2014 Mid 2016 Project completed June 2016.
Macleay Island, new boat ramp Prior to 2011 Late 2017 Redland City Council (RCC) is managing the project. Delivery scheduled for completion late 2017.
Capital grant projects funded through the MIF or MICMP from 1 July 2015 – listing current at 18 August 2016

Project Announced Planned completion Status
Mackay/Whitsunday
Whisper Bay, Cannonvale (Whitsunday Coast) new breakwater and floating walkway at boat ramp Aug 2015 Completed Project completed December 2015. $3 million Transport and Main Roads grant to Whitsunday Regional Council.
View a photo of the new breakwater and floating walkway (JPG, 537 KB).
Metro
William Street, Cleveland two new floating walkways Mar 2014 Completed Project completed December 2015.
View a photo of the new north-eastern floating walkway (JPG, 215 KB).
View a photo of the new south-western floating walkway (JPG, 2.03 MB).
William Street, Cleveland access channel and basin dredging Jun 2015 Mid 2017 Dredging approvals stage (TMR action). Project jointly funded by TMR and Redland City Council (RCC). Project delivery by RCC.
William Street, Cleveland breakwater extension Jun 2015 Mid 2018 Planning stage. Project jointly funded by TMR and Redland City Council (RCC). Project delivery including approvals to be by RCC.
Significant maintenance and other works delivered through the MIF or MICMP from 1 July 2015 – listing current at 26 July 2016

Project Announced Planned completion Status
Statewide
Update to the Recreational Boating Facilities Demand Forecasting Study N/A December 2016 Consultation phase currently on track with consultant GHD Pty Ltd and TMR representatives meeting face-to-face with councils and port authorities with more than 5 facilities. Final report scheduled for completion December 2016 with a late 2017 update to incorporate the 2016 Census data.
Boat ramp toe protection design trials N/A
Late 2016 Design trial aimed at preventing propeller wash taking away the loose rock at the end of the boat ramp. The trial is to use a concrete plank with a flexible connection extending from the bottom of the ramp and possibly a flexible matting connected to this. The trials at Amity Point and North Stradbroke Island have been a success. The hinged toe protection concrete planks and flexible matting are now part of the standard drawings for all new and upgraded boat ramps.
Far North
Rocky Point (Dayman Point, Daintree area) breakwater repair N/A Completed Project completed May 2016.
Palm Cove (north of Cairns) boat ramp removal Oct 2015 Completed Demolition completed July 2016.
Green Island (Cairns) jetty repairs N/A Late 2016 Ports North is managing the project with funding contribution from Transport and Main Roads.
North West
Burketown jetty fender piles replacement (Truganini Landing) N/A Completed Project completed December 2015.
View a photo of the new jetty fender piles (JPG, 92 KB).
Normanton jetty fender piles replacement N/A Completed Project completed December 2015.
View a photo of the new jetty fender piles (JPG, 122 KB).
Northern
Burdekin, Wallace Landing, Peake Road boat ramp reconstruction Sep 2015 Completed Project completed December 2015.
View a photo of the boat ramp reconstruction (JPG, 322 KB).
Townsville Recreational Boating Park ramps A and B mud removal N/A May 2016 Mud removal to below the level of ramps A and B. This is required to mitigate the ingress of mud. Contract awarded July 2016 with the timing of works scheduled for mid-September 2016.
Mackay/Whitsunday
Brampton Island jetty decommissioning N/A Mid 2016 Project completed May 2016.
Molongle Creek survey and modelling feasibility study N/A Sep 2016 Feasibility study of options for Molongle Creek entrance channel. Study scheduled to be completed late 2016.
Fitzroy
Emu Park social and economic benefits and impacts study for proposed boat ramp Jan 2015 Mid 2016 Social and economic benefits impact study commenced April 2016 with a community information day and an on line survey which closed in June 2016 with over 1,000 responses received. On-line survey fact sheet released to the public July 2016.GHD draft report review to be finalised August 2016.
View the terms of reference (PDF, 2.93 MB).
Find more information about the Emu Park recreational boating study.
Rosslyn Bay Boat Harbour maintenance dredging Ongoing Sep 2016 Dredging continuing.
View the Environmental Management Plan (PDF, 16.54 MB).
Wide Bay/Burnett
Burnett Heads Boat Harbour bed levelling N/A Oct 2016 TMR has completed bed levelling works to improve navigational conditions in the harbour. Quotes have been gained for some additional sediment removal beside the boat ramp to improve navigational access. TMR is waiting on approval from Gladstone Ports Authority for placement of the material in their facility.
Woodgate boat ramp repairs N/A Completed Repairs of the beach ramp at Woodgate completed June 2016.
North Coast
Scarborough boat harbour, maintenance dredging N/A Completed Project completed September 2015.
Mooloolaba Harbour entrance maintenance dredging N/A Sep 2016 Clearing of entrance shoal. Works being undertaken by Sunshine Coast Regional Council. Dredging continuing.
Metro
Victoria Point jetty stem re-decking and bolt replacement N/A Completed Project completed October 2015.
Cabbage Tree Creek (Sandgate) maintenance dredging N/A Completed Dredging completed May 2016.

$25m spent on Townsville boat park alone.

Time for the NT Government to start getting serious about fishing and boating?

Or is it just different economies of scale?


Simmo83
Platinum Member
Platinum Member
Posts: 162
Joined: Sat Sep 19, 2015 5:40 pm

Re: NT boat ramps

Post by Simmo83 »

I hate to say it but things like boat rego and fishing licenses help pay for these things, look at WA with their licensing, artificial reefs, boat ramp upgrades, better research for more appropriate bag limits etc. enonomies of scale will play a part too in this.
Bruce Simpson
197 Pioneer Sportfish - 175hp Honda.
Ex Sandgroper from Karratha
Member of KBGFC and DGFC.
User avatar
Blinky
Jedi Seadog
Jedi Seadog
Posts: 3309
Joined: Mon Jul 03, 2006 10:18 am
Location: Darwin. N.T.
Contact:

Re: NT boat ramps

Post by Blinky »

Got to agree with Simmo83 on this one. Without funds coming in we will get next to nothing........
Blinky

Find us on Facebook: Blinky's Lures
slug
Jedi Seadog
Jedi Seadog
Posts: 997
Joined: Mon Mar 19, 2007 8:01 am

Re: NT boat ramps

Post by slug »

Simmo83 wrote:I hate to say it but things like boat rego and fishing licenses help pay for these things, look at WA with their licensing, artificial reefs, boat ramp upgrades, better research for more appropriate bag limits etc. enonomies of scale will play a part too in this.


Yeah but in the West you need to be a Philadelphia lawyer to understand what licence to catch what species in what area, etc, and a hire an administrative assistant to keep on top of it all ......
User avatar
Matt Flynn
Site Administrator
Site Administrator
Posts: 16186
Joined: Thu Jan 01, 1970 9:30 am
Location: Somewhat Southerly
Contact:

Re: NT boat ramps

Post by Matt Flynn »

Yeah but in the West you need to be a Philadelphia lawyer to understand what licence to catch what species in what area, etc, and a hire an administrative assistant to keep on top of it all ......


Yup, it got to the point where I could hardly get my head around it all, and when you do, they change it. Vastly different rules in every state, a nightmare if you are touring.

Perhaps a national blanket rule that you can have 10kg of fillets in your creel each, catch them any way you want except dynamite or poison :D :D :D

Might not be good for garfish stocks though :lol:
nomad
Jedi Seadog
Jedi Seadog
Posts: 5770
Joined: Wed Dec 23, 2009 10:29 pm
Location: PALMERSTON
Contact:

Re: NT boat ramps

Post by nomad »

Ive been saying it for ages. The more income they can generate by rego and licencing the better.
Tassie is a great example as well. On my form down the rei nominated my local fishing hole and within 6 mths, had a new ramp and jetty. – remember that there isn’t much tide movements on inland lakes.
We could learn by other states cock ups and get a standard licence
User pays lives
Simmo83
Platinum Member
Platinum Member
Posts: 162
Joined: Sat Sep 19, 2015 5:40 pm

Re: NT boat ramps

Post by Simmo83 »

I won't argue about the WA bag limits, it takes some time to get your heads around with spieces limits and overall group limits but the fees payed in the licenses and boat registration do upgrade many facilities. All that mattered was 3 reds, 1 trout and something else tasty each then go and catch billfish :)
Bruce Simpson
197 Pioneer Sportfish - 175hp Honda.
Ex Sandgroper from Karratha
Member of KBGFC and DGFC.